Project Case Studies |
| Over the last 20 years, Virtual Build Technologies has performed design and consulting services on ground-breaking projects all over the world. After introducing the technology that made BIM possible, VBT has consistently pushed the boundaries of the industry by working with cutting edge architects, builders and developers. That experience has now culminated in the introduction of RhinoBIM, software modules designed specifically with AEC world in mind. |
 |
CASE STUDY #1:
3D Modeling Made Real
Monumental Fish Sculpture, 1992
A VBT & Frank Gehry first
|
|
 |
CASE STUDY #2:
First Full BIM project
Walt Disney Concert Hall, Los Angeles, 1994
Frank Gehry, Architect
|
|
 |
CASE STUDY #3:
Curvy, Complicated is doable
Guggenhiem Museum, 1994
Frank Gehry, Architect |
|
 |
CASE STUDY #4:
Rhino comes of age
Art Gallery of Alberta, Edmonton
Randall Stout, Architect |
|
| |
|
|
|
|
|
|
|
|