Project Case Studies

Over the last 20 years, Virtual Build Technologies has performed design and consulting services on ground-breaking projects all over the world. After introducing the technology that made BIM possible, VBT has consistently pushed the boundaries of the industry by working with cutting edge architects, builders and developers. That experience has now culminated in the introduction of RhinoBIM, software modules designed specifically with AEC world in mind.

 

CASE STUDY #1:

3D Modeling Made Real

Monumental Fish Sculpture, 1992
A VBT & Frank Gehry first

 

 

CASE STUDY #2:

First Full BIM project


Walt Disney Concert Hall,
Los Angeles, 1994
Frank Gehry, Architect

 

CASE STUDY #3:

Curvy, Complicated is doable

Guggenhiem Museum, 1994
Frank Gehry, Architect

Art Gallery of Alberta

CASE STUDY #4:

Rhino comes of age

Art Gallery of Alberta, Edmonton
Randall Stout, Architect

   
   

 

 

 

 
Copyright © 2010 Virtual Build Technologies. All Rights Reserved.